MARCH 7

Today, we continued in the workshop with the building, in which we have pasted everything and inserted the items that will, as for example the timer, leds, the servo or sensor. Within the booth will be engaged the protoborad with everything you need to make the barrier is raised and lowered.

Here we leave some pictures so you can see the building finished with everything in place from front or back:




In addition to that, we have also been perfecting the entries that have the little home: