viernes, 23 de marzo de 2018

MARCH 21

This day we continue in the workshop with the plans for the parking. Our teacher explained some things that were wrong of the project and how we could improve them, so we have changed the way in which we are going to develop and to create the project with respect to the parking spaces and their locations.
In addition, we have finished painting the red and white stripes that leads the building.

martes, 20 de marzo de 2018

MARCH 20

Today, we continued in the workshop with the booth to move forward. We painted the stripes that we lacked with white paint, since we already have the red lists.





In addition, we have made plans for the road in the large wood that we bought the other day, to know where we're going to put the house and where they will be able to drive the car. We have not left ended since it takes a lot but we have made good progress.



miércoles, 14 de marzo de 2018

MARCH 14

We have purchased a sheet of plywood bigger so that the project may have more space. In addition, as we already have the adornandola ready, we've been a bit. First we've done some small scratches to make it better and after we painted the stripes with red paint.



MARCH 13

Today, we continued in the workshop with the booth, we have cut the wooden parts of the left that we didn't need and we have left everything well sanding.




Apart from that, we have made this video in which we explain the whole process that we have continued to make the booth and what material we are going to put in each part of the building. Here is the video:


                                    


jueves, 8 de marzo de 2018

MARCH 7

Today, we continued in the workshop with the building, in which we have pasted everything and inserted the items that will, as for example the timer, leds, the servo or sensor. Within the booth will be engaged the protoborad with everything you need to make the barrier is raised and lowered.

Here we leave some pictures so you can see the building finished with everything in place from front or back:




In addition to that, we have also been perfecting the entries that have the little home:




martes, 6 de marzo de 2018

MARCH 6

Today we have been in the workshop to continue riding the parking after a few weeks without raising because we were programming the display.

The first thing that we have done has been to paste the pieces of wood that will form the kiosk where is going to be the breadboard.



After that we have waited for it to dry.




Finally, as the class was ending, we have placed the small kiosk where we place the counter to see if it was everything in its place, and so it has been.



viernes, 2 de marzo de 2018

MARCH 2

Today, we continued with the programming for the Arduino to get our program. We thought we had already finished, but we realized that there are certain small details, without which, the program cannot function normally, therefore, our teacher has explained us how to improve it to make it work so we can have it ready.

MAY 23

Today, we have followed with the programming for the Arduino program while conectabamos conectabamos required cables for everything to work ...